Liberty Inspection Corp

Overview

Track building settlement and structural movement with precision optical surveying, safeguarding neighboring properties throughout every phase of your construction project.

Our engineers install reflective prism targets on adjacent facades and take baseline measurements using a precision total station. Movement in north, east, or vertical axes is detected and documented at each visit, providing early warning before structural damage can occur.

Why Liberty Inspection

Liberty Inspection Corp brings PE-level expertise to every optical monitoring engagement, delivering accurate, traceable measurement data that satisfies NYC DOB requirements and protects project stakeholders from liability throughout the construction process.

Precision Surveying

High-precision total station equipment detects millimeter-level movement in three spatial axes.

Baseline Established

Initial readings are taken before work begins, providing a certified reference for all future data.

Multi-Point Coverage

We install monitoring points across all critical exposures of each adjacent structure on site.

NYC DOB Compliant

Reports align with NYC Tenant Protection Plan and Building Code structural monitoring standards.

What We Provide

Common Questions

What is optical monitoring used for in construction?

It measures whether adjacent buildings are physically moving or settling due to nearby excavation or foundation work, providing early warning of structural distress before visible damage appears.

The number varies by project scope. Liberty typically installs 8 to 12 monitoring points per structure, covering all exposed faces to ensure comprehensive settlement detection across the building.

Our total station equipment measures to sub-millimeter accuracy. Readings are referenced to fixed control points located away from the active construction zone to ensure measurement integrity.

Follow-up readings are scheduled based on construction intensity and phase. During active excavation or foundation work, increased frequency monitoring may be required by the DOB.

Our PE issues an immediate notification to the contractor and owner. Construction affecting the monitored structure is suspended pending engineering review and implementation of protective measures.